Construction Update - Week of March 25, 2024
Please see the attached traffic control graphic for the week of March 25, 2024.
- Construction will continue to occur within the sidewalk on the Power House side. Pedestrians will be re-routed to use the sidewalk on the DHEC building side. (Page 2)
- Work will continue to occur inside the gravel parking lot on McMillan / Avenue D. Fencing and signage will be present to separate construction and the parking lot. (Page 2)
- Traffic on N. Hobson, from Kilo St. to Pipefitter., will continue to run from the west side lanes to the east side (shipyard side). (Page3)
- Beginning on Monday, March 25, 2024, two flagging operations will occur. Both operations will shift traffic to the far east (shipyard side) lanes.
- Across from Pipefitter in front of the Smithey’s Ironworks. (Page 4)
- In front of the Neal Brothers buildings. (Page 5)
- Traffic will then be shifted back to the west side lanes between Pipefitter St. and McMillan Ave.
Additional information concerning the NBIF project can be found here.